Home Building - July 30, 2000

P0000472

They've started putting the windows in. Lattices are added as part of the finish work.

P0000474

The screened porch is all framed, and the Chesapeake blue trim is going up.

P0000476

The rig is drilling for water. Unfortunately, after 445 feet they still hadn't gotten a high enough flow rate. Hopefully this will be remedied by pressurizing the well.