More than half the house is covered with clapboards now.
|
Here's a closer view of the front of the house. The pipe on the left
is a stub for the wastewater, and will be buried when the septic
system is installed.
|
There's a deep gully with a small stream beside the house. The pipe
in the hill is just for draining the foundation, and will be cut back
to be more aesthetically pleasing.
|
Stairs in the garage lead up to a large storage area that could
potentially be finished one day as an office.
|
The mason did a nice job on the chimney in the living room. The pipe
on the left hand side is for the wood stove.
|
That sure is a lot of wire! Every room in the house is wired with
Cat5E (network) and RG6 (coax).
|