Abridged      Table of Contents      Home
Previous      Start Slideshow      Next

Home Building - August 15, 2000

P0000492

More than half the house is covered with clapboards now.

P0000493
P0000494
P0000495
P0000496
P0000497
P0000498
P0000499
P0000500

Here's a closer view of the front of the house. The pipe on the left is a stub for the wastewater, and will be buried when the septic system is installed.

P0000501
P0000502

There's a deep gully with a small stream beside the house. The pipe in the hill is just for draining the foundation, and will be cut back to be more aesthetically pleasing.

P0000503

Stairs in the garage lead up to a large storage area that could potentially be finished one day as an office.

P0000504

The mason did a nice job on the chimney in the living room. The pipe on the left hand side is for the wood stove.

P0000510
P0000511

That sure is a lot of wire! Every room in the house is wired with Cat5E (network) and RG6 (coax).

P0000512

Abridged      Table of Contents      Home
Previous      Start Slideshow      Next


Last modified: Fri Dec 14 02:36:57 2001
tale@dd.org