The mailbox is a HeavyBilt steel box (40 pounds!) mounted on "The
PlowMaster" (aarrrr!).
It is supposed to swing out of the way when
the snowplow comes barreling past.
Drywalling is well underway. The living room has been all walled in.
The master bedroom closets flank the entrance to the master bath.
Look, another big hole in the ground!
This one is for the septic tank.
The excavators are hard at work in the rain.
Love that motto!
We've had so much rain, we decided to put in rice paddies!
Well, not really. These are the leach fields for the septic system.